Ruler artifact vs. true adjustment

Read the 2026 regime note →
Loading 2025 ↔ 2026 plane-normalized zone bridge…

How this works

Every 2025 regular-season pitch (711,897 pitches) is propagated along its measured constant-acceleration trajectory (vx0..az) from front-of-plate (y = 17/12 ft) to mid-plate (y = 17/24 ft) via plate_to_plane() and re-graded against each batter’s 2026 fixed ABS box (sz_top/sz_bot). The gap between raw 2025 and normalized 2025 is the pure Ruler Artifact; the gap between normalized 2025 and actual 2026 is the True Behavioral Shift.